REINFORCED EARTH WALL
Where: Fermont, Bloom Lake
When: 2009
Description: Erection of a reinforced earth retaining wall for the installation of Bloom Lake's mine crushing system.
RAILWAY WORK Pointe-Noire Terminal for Consolidated Thompson
Where: Sept-Îles, Pointe-Noire
When: January to July 2010
Description: General excavation and preparation work at Consolidated Thompson's operations site.
CULVERTS QNS&L Railway
Where: QNS&L Railway, Sept-Îles
When: 2008-2009-2010
Description: Replacement of culverts under the railway linking the Sept-Îles and Labrador facilities.
DIKE WORK ArcelorMittal Mines Canada
Where: Port-Cartier
When: 2006-2008-2010
Description: Rise and repair of dikes at ArcelorMittal Mines Canada's tailing site.
ROAD CONSTRUCTION Bloom Lake Ore Mine Main Access Road
Where: Fermont, Bloom Lake
When: 2008
Description: Construction of a 5 km road segment accessing the Bloom Lake mine site.
MINING Stripping of Bloom Lake Mine
Where: Fermont, Lac Bloom
When: 2008
Description: Stripping and preparation of Bloom Lake mine site.
CRUSHING
Description: Crushing of aggregate into different sizes and quarrying of Marconi Quarry in Sept-Îles.
DISMANTLING OF INFRASTRUCTURES
Where: Lac Cacaoui
When: 2010
Description: Dismantling of a damn on Lac Cacaoui, 85 km North of Sept-Iles. Demolition of several buildings and damns, and iron recovery.